faq
FAQ

What are the reasons for the quality problems of the pellet machine ring die?

The quality problems of the wood pellet machine ring die generally have the following reasons:

1) The fixing bolt is too short; the bolt quality problem and material (grade 8.8).

2) Fixed shackle is too long.

3) Dirt contained in the plug hole; ring die drive rim or hoop wear.

4) New and old ring dies and pressure rollers.

5) The pressure roller is adjusted too tightly.

6) The eccentric shaft adjusts the wrong direction.

7) Excessive open rate or wrong relief hole.

8) The ring die is installed obliquely.

9) The drive rim or feed rotating cone ring is not clean.

10) Excessive wear of the ring die.

11) The ring die continues to be overloaded.

MORE FAQSMORE
I want to open a feed mill, do you provide turnkey service?...[ 2021-04-27]
We have the interest to be a distributor for these biomass fuel pellet mill machine produc...[ 2021-04-19]
Our Company is located in Ukraine. The mainly biomass materials in Ukraine is reed, straw ...[ 2021-04-18]
What are the wearing parts of ring die wood pellet maker machine?...[ 2021-04-17]
What's the meaning of GJ? What's the calorific value of wood pellets?...[ 2021-04-16]
INQUIRY
RICHI VIDEO

How to build a complete animal feed pellet production line

Wood Sawdust Making Machine, Wood Chips Crushing Machine

Animal Feed Mill Plant, 10TPH Feed Production Line 3D Modeling

Turn-key Poultry Feed Pellet Production Line

How to setup a complete fish feed pellet production line

×
CONTACT US

Please send your requirements, RICHI's consultants will get back to you quickly.

Please specify your requirement by referring to the following aspects,RICHI's consultants will get back to you quickly :

  1. 1What capacity will meet your demand? (Key point)
  2. 2What kind of raw material and expected final product are you planning to have? (Right solution begins from material and product)
  3. 3When is the project supposed to be running? (Key info for A-Z project programming)
  4. 4Budget for machinery purchasing? (Key infomation for right model)
  5. 5Points that you really focus on. (Customized service from our project consultant)
Get Quote
E-mail