faq
FAQ

What should I do if the superfine grinder is to be stopped for a period of time?

Regarding the maintenance and storage of the animal feed superfine grinder equipment:

(1) Frequently check the fastening of each part to prevent it from loosening and falling off and damaging the machine.

(2) The oil filling holes should be filled frequently, and the bearing parts should be cleaned and filled with lithium grease every six months.

(3) When the machine is stopped for operation, the machine should be idling for a period of time, and the remaining material in the machine should be blown off before shutting down.

(4) When the machine is out of service, the debris outside the machine should be removed, all rotating parts should be filled with grease, and stored in a dry air, no corrosive gas warehouse.

MORE FAQSMORE
I want to open a feed mill, do you provide turnkey service?...[ 2021-04-27]
We have the interest to be a distributor for these biomass fuel pellet mill machine produc...[ 2021-04-19]
Our Company is located in Ukraine. The mainly biomass materials in Ukraine is reed, straw ...[ 2021-04-18]
What are the wearing parts of ring die wood pellet maker machine?...[ 2021-04-17]
What's the meaning of GJ? What's the calorific value of wood pellets?...[ 2021-04-16]
INQUIRY
RICHI VIDEO

How to build a complete animal feed pellet production line

Wood Sawdust Making Machine, Wood Chips Crushing Machine

Animal Feed Mill Plant, 10TPH Feed Production Line 3D Modeling

Turn-key Poultry Feed Pellet Production Line

How to setup a complete fish feed pellet production line

×
CONTACT US

Please send your requirements, RICHI's consultants will get back to you quickly.

Please specify your requirement by referring to the following aspects,RICHI's consultants will get back to you quickly :

  1. 1What capacity will meet your demand? (Key point)
  2. 2What kind of raw material and expected final product are you planning to have? (Right solution begins from material and product)
  3. 3When is the project supposed to be running? (Key info for A-Z project programming)
  4. 4Budget for machinery purchasing? (Key infomation for right model)
  5. 5Points that you really focus on. (Customized service from our project consultant)
Get Quote
E-mail